Our Latest News

  • Thu Jan 26, 2012 | ASTRAL ANNOUNCES PRIVATE PLACEMENT OF CONVERTIBLE NOTES

  • Mon, Jan 23, 2012 | ASTRAL ANNOUNCES THE RESIGNATION OF MR. DAVID TERRY

  • Mon, Dec 12 | Astral Drills 5m averaging 39g/t Gold and 93g/t Silver at Los Crestones Project, Sierra Madre Gold-Silver Belt, Mexico


    Astral Drills 5m averaging 39g/t Gold and 93g/t Silver at Los Crestones Project, Sierra Madre Gold-Silver Belt, Mexico

    Vancouver, BC - Astral Mining Corporation (TSX-V AA, AA.WT) ("Astral" or "the Company") is pleased to report the second batch of r...

    Read more...
  • Fri, Dec 2, 2011 | Astral Amends Honeymoon Option Agreement


    Vancouver, British Columbia – December 2, 2011 - Astral Mining Corporation (AA.TSXV) (“Astral” or the “Company”) has entered into an amending agreement with David James Piggin dated November 12, 2011 (“the Amending Agreement”) that amends the option agreement date...

    Read more...
  • Tue, Nov 1, 2011 | Astral Closes Private Placement With Mineralfields

    Vancouver, British Columbia – October 28, 2011 - Astral Mining Corporation (AA.TSXV) (“Astral” or the “Company”) is pleased to announce that it has closed its non-brokered private placement with the Mineralfields Group for gross proceeds of $300,000, as previously announced on...

    Read more...

Subscription

Select Your Language

Project Galleries








HONEYMOON - GOLD, SILVER & COPPER PROPERTY


Ownership:

100% Astral Mining Corp


The Honeymoon Property is within the Kootenay Terrane, underlain by rocks of the Palaeozoic Eagle Bay Assemblage and intruded by phases of the mid-cretaceous Baldy Batholith. The property covers 18,761 hectares and contains numerous mineralized showings, soil geochemical anomalies and limited historical trenching and drilling. Parts of the property were optioned by Teck Corporation in May 1999. Exploration during that year targeted a large vein system exposed at the Cam Gloria showing which returned best trench results of 2m averaging 9.26 g/t Au and diamond drill results including 1m grading 9.57 g/t Au and 128.4 g/t Ag (BC Assessment report No 26215). 

The Honeymoon project is located 20km southeast of Yellowhead Mining Inc's Harper Creek Copper Deposit that contains an estimated Indicated Resource of 569 million tonnes containing 4,010 million lbs Cu*. Past producing mines in the immediate area include Samatosum Mountain (Minfile 082M 244), and the historic Homestake (Minfile 082M 025) and Windpass (Minfile 092P 039) mines**.

Astral is currently compiling surface sample data including soil sampling, grab and channel sampling from across the property as collected by the vendor. The 2011 exploration season will include field checks of existing showings and trenching designed to confirm targets in anticipation of a fall drilling program.

The Honeymoon property is located in close proximity to the Astral's Barriere Ridge property 6km to the west. Astral intends to explore both properties in conjunction.

www.yellowheadmining.com
** Taken from BC Minfile production summaries http://minfile.gov.bc.ca\